Free shipping in Germany over 49 €         30-day right of return         Over 150 years of experience
Magnum
Sale
Magnum

Long Lead EDC

26,95 € * 35,95 € You save 25%

*All prices include VAT, shipping costs will be charged separately.

In stock

  • Pocket Knife
  • Yes
  • Magnum
  • Darf geführt werden
  • 18,40 cm
  • 8,00 cm
  • 2,70 mm
  • 78,00 g
  • 440B
  • G10
  • Nail Nick
  • Manual
  • Slipjoint
  • Asia
  • Black
  • Uncoated
  • 01SC080
Laser Engraving
Frontside (+ 19,95 € / *)
reset
Backside (+ 19,95 € / *)
reset
Font 
reset
Vatertags-Emblem (+ 19,95 € / *)
reset
Free Mother's Day Emblem (+ 19,95 € / *)
reset
Blade | Laser Engraving | Font (+ 19,95 € / *)
reset
* Required field
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint...read more
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 440B stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).

Warning and safety information:
Cut injuries: The most common danger when using knives is the risk of cuts. Sharp blades can quickly penetrate skin and tissue.
Slipping of the knife: Improper or excessive pressure can cause the knife to slip, resulting in uncontrolled movements that can cause injuries.
Injuries due to falls: Knives should never be left unsecured or near table edges to prevent them from falling and injuring someone.
Blunt knives: Blunt knives pose a greater risk of injury as they require more force and can slip more easily. Knives should therefore be properly sharpened regularly.
Improper use: Using a knife for tasks for which it is not intended (e.g. as a lever tool) can not only damage the blade, but also lead to accidents.

Read, write and discuss reviews...Read or write reviews
Reviews for "Long Lead EDC"
Write a review
Reviews will be activated after a verification.
Help other interested parties with their purchase decision. We appreciate your honest evaluation.

The fields marked with * are required.

Sonstiges
Sale
Böker Germany Catalog Outdoor & Collection

In stock

  • Other
1,00 € * 0,00 € *
Taschenmesser, Schwarz, Flipper, Framelock, Nitro-V, G10
Sale
Böker Plus Friday

In stock

  • Pocket Knife
  • Nitro-V
  • G10
  • Alban Le Henry
  • Framelock
  • Flipper
49,95 € * 29,95 € *
Taschenmesser, Braun, Daumenöffnung, Linerlock, 440A, Micarta
Sale
Magnum Toxicofera

In stock

  • Pocket Knife
  • 440A
  • Micarta
  • Linerlock
  • Thumb Hole
36,95 € * 29,95 € *
Feststehendes Messer, Schwarz, Feststehend, 7Cr17MoV, Micarta
Sale
Magnum Straight Karambit

In stock

  • Fixed Blade
  • 7Cr17MoV
  • Micarta
  • Ruben Fritton
  • Fixed
66,95 € * 24,95 € *
Taschenmesser, Blau, Daumenpin, Button Lock, 440A, Micarta
Sale
Magnum Bluejay

In stock

  • Pocket Knife
  • 440A
  • Micarta
  • Button Lock
  • Thumb Stud
36,95 € * 19,95 € *
Taschenmesser, Schwarz, Nein, Backlock, 440A, G10
Magnum Most Wanted

In stock

  • Pocket Knife
  • 440A
  • G10
  • Backlock
  • No
29,95 € *
Taschenmesser, Schwarz, Flipper, Linerlock, 440B, Aluminium
Sale
Magnum MF.3

In stock

  • Pocket Knife
  • 440B
  • Aluminum
  • Grigorii Matveev
  • Linerlock
  • Flipper
40,95 € * 19,95 € *
Taschenmesser, Schwarz, Nein, Backlock, 440B, TPE
Sale
Magnum Echidna

In stock

  • Pocket Knife
  • 440B
  • Nylon, TPE
  • Raphael Durand
  • Backlock
  • No
36,95 € * 29,95 € *
Taschenmesser, Braun, Daumenöffnung, Framelock, Nitro-V, G10
Sale
Böker Plus Swoopy

In stock

  • Pocket Knife
  • Nitro-V
  • G10
  • Michael Burch
  • Framelock
  • Thumb Hole
85,95 € * 34,95 € *
Zubehör
Sale
Magnum Messerkette

In stock

  • Accessory
5,95 € * 3,95 € *
Schärfgerät, Schwarz
Sale
Böker Germany Pocket Sharpener

In stock

  • Sharpener
6,95 € * 4,95 € *
Taschenmesser, Schwarz, Druckknopf, Button Lock, D2, Aluminium
Sale
Böker Plus Kwaiken Grip Auto

In stock

  • Pocket Knife
  • D2
  • Aluminum
  • Lucas Burnley
  • Button Lock
  • Push Button
49,95 € * 29,95 € *
Etui, Schwarz
Böker Plus Nylon Case

In stock

  • Pouch
9,95 € *
Feststehendes Messer, Schwarz, 440C, G10
Sale
Böker Plus J-Bite

In stock

  • Fixed Blade
  • 440C
  • G10
66,95 € * 39,95 € *
Taschenmesser, Braun, Nagelhau, Slipjoint, Damast, Ebenholz
Magnum Ebony Rangebuster Damascus

In stock

  • Pocket Knife
  • Damascus
  • Ebony
  • Slipjoint
  • Nail Nick
49,95 € *
Kochmesser, Schwarz, Feststehend, Kunststoff
Sale
Böker Plus Sandwich Knife Black

In stock

  • Kitchen Knife
  • Synthetic
  • Fixed
3,95 € * 2,95 € *
Taschenmesser, Braun, Daumenöffnung, Linerlock, 7Cr17MoV, Rosenholz
Magnum Outdoor Cuisine III

In stock

  • Pocket Knife
  • 7Cr17MoV
  • Tulip Wood
  • Linerlock
  • Thumb Hole
34,95 € *
Taschenmesser, Braun, Nagelhau, Slipjoint, 440A, Schichtholz
Magnum Bon Appetite

In stock

  • Pocket Knife
  • 440A
  • Pakka Wood
  • Slipjoint
  • Nail Nick
29,95 € *
Taschenmesser, Grau, Flipper, Linerlock, 440A, Stahl
Sale
Magnum Urban Tank

In stock

  • Pocket Knife
  • 440A
  • Steel
  • Linerlock
  • Flipper
39,95 € * 29,95 € *
Taschenmesser, Grün, Flipper, Double Detent Ball, 14116, Polypropylen
New
Böker Plus Fire Ant Green

In stock

  • Pocket Knife
  • 14116
  • Polypropylene
  • Double Detent Ball
  • Flipper
34,95 € *
Taschenmesser, Silber, Nagelhau, Slipjoint, 12C27, Edelstahl
Böker Plus Atlas Mini

In stock

  • Pocket Knife
  • 12C27
  • Stainless Steel
  • Slipjoint
  • Nail Nick
19,95 € *
Taschenmesser, Braun, Nagelhau, Linerlock, 420, Buchenholz
New
Böker Plus Rusticus Medium

In stock

  • Pocket Knife
  • 420
  • Beech Wood
  • Linerlock
  • Nail Nick
16,95 € *
Taschenmesser, Braun, Nagelhau, Linerlock, 420, Holz
Böker Plus Rusticus

In stock

  • Pocket Knife
  • 420
  • Wood
  • Linerlock
  • Nail Nick
19,95 € *
Taschenmesser, Schwarz, Daumenpin, Button Lock, D2, Micarta
Sale
Kershaw Remnant

In stock

  • Pocket Knife
  • D2
  • Micarta
  • Button Lock
  • Thumb Stud
125,95 € * 75,95 € *
Taschenmesser, Schwarz, Nagelhau, Linerlock, D2, G10
BlackFox Teeny D2 Black G10

In stock

  • Pocket Knife
  • D2
  • G10
  • Linerlock
  • Nail Nick
33,95 € *
Taschenmesser, Silber, Nagelhau, Backlock, Nitro-V, 2Cr13
Böker Plus MEK

In stock

  • Pocket Knife
  • Nitro-V
  • 2Cr13
  • Backlock
  • Nail Nick
49,95 € *
Taschenmesser, Schwarz, Flipper, Double Detent Ball, 14116, Polypropylen
Böker Plus Fire Ant Black

In stock

  • Pocket Knife
  • 14116
  • Polypropylene
  • Double Detent Ball
  • Flipper
34,95 € *
Taschenmesser, Rot, Flipper, Double Detent Ball, 14116, Polypropylen
Böker Plus Fire Ant Red

In stock

  • Pocket Knife
  • 14116
  • Polypropylene
  • Double Detent Ball
  • Flipper
34,95 € *
Taschenmesser, Schwarz, Flipper, Framelock, Nitro-V, G10
Sale
Böker Plus Friday

In stock

  • Pocket Knife
  • Nitro-V
  • G10
  • Alban Le Henry
  • Framelock
  • Flipper
49,95 € * 29,95 € *
Feststehendes Messer, Schwarz, D2, G10
Sale
Böker Plus Ylvi

In stock

  • Fixed Blade
  • D2
  • G10
  • Midgards Messer
66,95 € * 49,95 € *
Taschenmesser, Blau, Daumenpin, Button Lock, 440A, Micarta
Sale
Magnum Bluejay

In stock

  • Pocket Knife
  • 440A
  • Micarta
  • Button Lock
  • Thumb Stud
36,95 € * 19,95 € *
Taschenmesser, Braun, Daumenöffnung, Linerlock, 440A, Micarta
Sale
Magnum Toxicofera

In stock

  • Pocket Knife
  • 440A
  • Micarta
  • Linerlock
  • Thumb Hole
36,95 € * 29,95 € *
Taschenmesser, Braun, Daumenöffnung, Framelock, Nitro-V, G10
Sale
Böker Plus Swoopy

In stock

  • Pocket Knife
  • Nitro-V
  • G10
  • Michael Burch
  • Framelock
  • Thumb Hole
85,95 € * 34,95 € *
Feststehendes Messer, Braun, Feststehend, 440A, G10
Sale
Magnum Li'l Friend Micro

In stock

  • Fixed Blade
  • 440A
  • G10
  • Fixed
28,95 € * 19,95 € *
Taschenmesser, Bronze, Daumenpin, Linerlock, 440C, Aluminium
Sale
Magnum Advance Checkering Dark Bronze

In stock

  • Pocket Knife
  • 440C
  • Aluminum
  • Linerlock
  • Thumb Stud
31,95 € * 23,95 € *
Taschenmesser, Schwarz, Nein, Backlock, 440B, TPE
Sale
Magnum Echidna

In stock

  • Pocket Knife
  • 440B
  • Nylon, TPE
  • Raphael Durand
  • Backlock
  • No
36,95 € * 29,95 € *
Taschenmesser, Schwarz, Daumenöffnung, Backlock, D2, G10
Sale
Böker Plus Epicenter Backlock

In stock

  • Pocket Knife
  • D2
  • G10
  • Todd Rexford
  • Backlock
  • Thumb Hole
121,95 € * 74,95 € *
Taschenmesser, Schwarz, Flipper, Linerlock, D2, GFN
Sale
Böker Plus Bend

In stock

  • Pocket Knife
  • D2
  • GFN
  • Lucas Burnley
  • Linerlock
  • Flipper
40,95 € * 24,95 € *
Taschenmesser, Schwarz, Flipper, Linerlock, VG-10, G10
Sale
Böker Plus Urban Trapper Stubby

In stock

  • Pocket Knife
  • VG-10
  • G10
  • Brad Zinker
  • Linerlock
  • Flipper
99,95 € * 59,95 € *
Flipper, Grau, Flipper, Framelock, MagnaCut, Titan
New
Böker Germany Super Conductor

In stock

  • Flipper
  • MagnaCut
  • Titanium
  • Brian Efros
  • Framelock
  • Flipper
349,00 € *
Feststehendes Messer, Schwarz, Feststehend, N695, G10
Sale
Böker Argentina Newenche

In stock

  • Fixed Blade
  • N695
  • G10
  • Fixed
166,95 € * 99,95 € *
Feststehendes Messer, Grün, SK-5, Micarta
Sale
Böker Plus Rold SK-5

In stock

  • Fixed Blade
  • SK-5
  • Micarta
160,95 € * 99,95 € *
Feststehendes Messer, Braun, D2, Micarta
Sale
Böker Plus Nessmi Pro

In stock

  • Fixed Blade
  • D2
  • Micarta
  • Jesper Voxnaes
74,95 € * 44,95 € *
Feststehendes Messer, Grau, D2, Micarta
Sale
Böker Plus Orca Pro

In stock

  • Fixed Blade
  • D2
  • Micarta
110,95 € * 79,95 € *
Feststehendes Messer, Schwarz, Feststehend, D2, G10
Sale
Böker Plus Pilot Knife 2.0

In stock

  • Fixed Blade
  • D2
  • G10
  • Dave Wenger
  • Fixed
99,95 € * 69,95 € *
Taschenmesser, Druckknopf, Button Lock, 440C, Titan
Sale
Böker Plus Cigar Cutter

In stock

  • Pocket Knife
  • 440C
  • Titanium
  • Button Lock
  • Push Button
125,95 € * 49,95 € *
Kochmesser, Braun, X50CrMoV15, Ahornholz
Sale
Böker Plus Forge Wood Office Knife

In stock

  • Kitchen Knife
  • X50CrMoV15
  • Maple Wood
32,95 € * 19,95 € *
Feststehendes Messer, Schwarz, 440C, G10
Sale
Böker Plus J-Bite

In stock

  • Fixed Blade
  • 440C
  • G10
66,95 € * 39,95 € *
Taschenmesser, Schwarz, Flipper, Double Detent Ball, 14116, Polypropylen
Böker Plus Fire Ant Black

In stock

  • Pocket Knife
  • 14116
  • Polypropylene
  • Double Detent Ball
  • Flipper
34,95 € *
Taschenmesser, Braun, Nagelhau, Palisanderholz
Sale
Magnum Classic Pocket Steel

In stock

  • Pocket Knife
  • Rosewood
  • Nail Nick
24,95 € * 19,95 € *
Taschenmesser, Schwarz, Daumenöffnung, Framelock, 14C28N, G10
Sale
Böker Plus Sliplock

In stock

  • Pocket Knife
  • 14C28N
  • G10
  • Kirk Mayberry
  • Framelock
  • Thumb Hole
74,95 € * 44,95 € *
Taschenmesser, Orange, Daumenpin, Linerlock, 440A, G10
Sale
DMAX Backpacker

In stock

  • Pocket Knife
  • 440A
  • G10
  • Linerlock
  • Thumb Stud
34,95 € * 14,95 € *
Taschenmesser, Schwarz, Druckknopf, Button Lock, D2, Aluminium
Sale
Böker Plus Kwaiken Grip Auto

In stock

  • Pocket Knife
  • D2
  • Aluminum
  • Lucas Burnley
  • Button Lock
  • Push Button
49,95 € * 29,95 € *
Taschenmesser, Schwarz, Flipper, Linerlock, 440B, Aluminium
Sale
Magnum MF.3

In stock

  • Pocket Knife
  • 440B
  • Aluminum
  • Grigorii Matveev
  • Linerlock
  • Flipper
40,95 € * 19,95 € *
Taschenmesser, Schwarz, Nein, Slipjoint, D2, G10
Sale
Böker Plus Bad Guy

In stock

  • Pocket Knife
  • D2
  • G10
  • Franck Souville
  • Slipjoint
  • No
112,95 € * 69,95 € *
Taschenmesser, Schwarz, Nein, Backlock, 440A, G10
Magnum Most Wanted

In stock

  • Pocket Knife
  • 440A
  • G10
  • Backlock
  • No
29,95 € *
Taschenmesser, Schwarz, Nagelhau, Backlock, MagnaCut, Edelstahl
Böker Germany Kihon Bifold 42a

In stock

  • Pocket Knife
  • MagnaCut
  • Stainless Steel
  • Lucas Burnley
  • Backlock
  • Nail Nick
114,95 € *
Feststehendes Messer, Schwarz, 440C, G10
Sale
Böker Plus Pocket Knife 2.0

In stock

  • Fixed Blade
  • 440C
  • G10
  • Mickey Yurco
49,95 € * 29,95 € *
Taschenmesser, Natural, Nagelhau, Slipjoint, 440C, G10
Sale
Böker Plus Celos G10 Jade

In stock

  • Pocket Knife
  • 440C
  • G10
  • Slipjoint
  • Nail Nick
60,95 € * 49,95 € *
Taschenmesser, Braun, Nagelhau, Linerlock, 420, Holz
Böker Plus Rusticus

In stock

  • Pocket Knife
  • 420
  • Wood
  • Linerlock
  • Nail Nick
19,95 € *
Taschenmesser, Schwarz, Flipper, Linerlock, D2, G10
Sale
Böker Plus Shamsher G10

In stock

  • Pocket Knife
  • D2
  • G10
  • Darriel Caston, Stan Moizis
  • Linerlock
  • Flipper
40,95 € * 24,95 € *
Taschenmesser, Schwarz, Nagelhau, Slipjoint, AUS-8, G10
Sale
Böker Plus Worldwide

In stock

  • Pocket Knife
  • AUS-8
  • G10
  • Chad Los Banos
  • Slipjoint
  • Nail Nick
50,95 € * 35,95 € *
Multitool, Schwarz, Kunststoff
Sale
DMAX Maxigrip

In stock

  • Multitool
  • Synthetic, Aluminum
37,95 € * 14,95 € *
Taschenmesser, Grün, Nagelhau, 440, Edelstahl
Sale
History Knife & Tool Japanese Army Pen Knife Can Opener

In stock

  • Pocket Knife
  • 440
  • Stainless Steel
  • Nail Nick
21,95 € * 13,95 € *
Taschenmesser, Grau, Flipper, Flipjoint, 440C, Edelstahl
Sale
Böker Plus Urban Spillo Flipjoint

In stock

  • Pocket Knife
  • 440C
  • Stainless Steel
  • Flipjoint
  • Flipper
77,95 € * 54,95 € *
Taschenmesser, Silber, Nagelhau, Slipjoint, 8Cr13MoV, Edelstahl
Magnum Shiny EDC

In stock

  • Pocket Knife
  • 8Cr13MoV
  • Stainless Steel
  • Slipjoint
  • Nail Nick
29,95 € *

Magnum

Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable price-performance ratio. However, it is not only the price-sensitive knife enthusiast who is fascinated by the wide range of handle materials and practical blade steels. The concept takes place in Solingen, design, construction and finishing in Asia.

Manufacturer information:
Heinr. Böker Baumwerk GmbH
Schützenstr. 30, 42659 Solingen, Germany
Web: www.boker.de/
E-Mail: info@boker.de
Phone: +49 212 40120

Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable... more

Show products