*All prices include VAT, shipping costs will be charged separately.
In stock
- Type: Pocket Knife
- Engraving: Yes
- Brand: Magnum
- WaffG Einstufung: Darf geführt werden
- Overall Length: 18,40 cm
- Blade Length: 8,00 cm
- Blade Thickness: 2,70 mm
- Weight: 78,00 g
- Blade Material: 440B
- Handle Material: G10
- Opener: Nail Nick
- Opening: Manual
- Lock Type: Slipjoint
- Made in: Asia
- Color: Black
- Blade Color: Uncoated
- Item Number: 01SC080
Warning and safety information:
Cut injuries: The most common danger when using knives is the risk of cuts. Sharp blades can quickly penetrate skin and tissue.
Slipping of the knife: Improper or excessive pressure can cause the knife to slip, resulting in uncontrolled movements that can cause injuries.
Injuries due to falls: Knives should never be left unsecured or near table edges to prevent them from falling and injuring someone.
Blunt knives: Blunt knives pose a greater risk of injury as they require more force and can slip more easily. Knives should therefore be properly sharpened regularly.
Improper use: Using a knife for tasks for which it is not intended (e.g. as a lever tool) can not only damage the blade, but also lead to accidents.
In stock
- Pocket Knife
- Damascus
- Ebony
- Slipjoint
- Nail Nick
In stock
- Pocket Knife
- 14116
- Polypropylene
- Double Detent Ball
- Flipper
In stock
- Pocket Knife
- 440C
- Stainless Steel
- Flipjoint
- Flipper
In stock
- Pocket Knife
- 14116
- Polypropylene
- Double Detent Ball
- Flipper
In stock
- Pocket Knife
- 14116
- Polypropylene
- Double Detent Ball
- Flipper
In stock
- Pocket Knife
- MagnaCut
- Micarta
- Chuck Gedraitis
- Slipjoint
- Nail Nick
In stock
- Pocket Knife
- 12C27
- Steel
- Slipjoint
- Nail Nick
In stock
- Pocket Knife
- 14116
- Ebony
- Slipjoint
- Nail Nick
In stock
- Pocket Knife
- 12C27
- Stainless Steel
- Slipjoint
- Nail Nick
In stock
- Pocket Knife
- MagnaCut
- Micarta
- Chuck Gedraitis
- Slipjoint
- Nail Nick
In stock
- Pocket Knife
- 440
- Stainless Steel
- Nail Nick
In stock
- Pocket Knife
- 440C
- Stainless Steel
- Flipjoint
- Flipper
In stock
- Pocket Knife
- Damascus
- Cocobolo Wood
- Raphael Durand
- Slipjoint
- No
In stock
- Pocket Knife
- Damascus
- Ebony
- Slipjoint
- Nail Nick
In stock
- Pocket Knife
- 14116
- Polypropylene
- Double Detent Ball
- Flipper
Magnum
Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable price-performance ratio. However, it is not only the price-sensitive knife enthusiast who is fascinated by the wide range of handle materials and practical blade steels. The concept takes place in Solingen, design, construction and finishing in Asia.
|
Manufacturer information: |
Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable... more