Fast Shipping         Free shipping in Germany over 49 €         Shop with Klarna         30-day right of return         Over 150 years of experience
Magnum

Long Lead EDC

35,95 € *

*All prices include VAT, shipping costs will be charged separately.

In stock

  • Pocket Knife
  • Yes
  • Magnum
  • Darf geführt werden
  • 18,40 cm
  • 8,00 cm
  • 2,70 mm
  • 78,00 g
  • 440B
  • G10
  • Nail Nick
  • Manual
  • Slipjoint
  • Asia
  • Black
  • Uncoated
  • 01SC080
Laser Engraving
Frontside (+ 19,95 € / *)
reset
Backside (+ 19,95 € / *)
reset
Font 
reset
Vatertags-Emblem (+ 19,95 € / *)
reset
Free Mother's Day Emblem (+ 19,95 € / *)
reset
Blade | Laser Engraving | Font (+ 19,95 € / *)
reset
* Required field
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint...read more
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 440B stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).

Warning and safety information:
Cut injuries: The most common danger when using knives is the risk of cuts. Sharp blades can quickly penetrate skin and tissue.
Slipping of the knife: Improper or excessive pressure can cause the knife to slip, resulting in uncontrolled movements that can cause injuries.
Injuries due to falls: Knives should never be left unsecured or near table edges to prevent them from falling and injuring someone.
Blunt knives: Blunt knives pose a greater risk of injury as they require more force and can slip more easily. Knives should therefore be properly sharpened regularly.
Improper use: Using a knife for tasks for which it is not intended (e.g. as a lever tool) can not only damage the blade, but also lead to accidents.

Read, write and discuss reviews...Read or write reviews
Reviews for "Long Lead EDC"
Write a review
Reviews will be activated after a verification.
Help other interested parties with their purchase decision. We appreciate your honest evaluation.

The fields marked with * are required.

Sonstiges
Sale
Böker Germany Catalog Outdoor & Collection

In stock

  • Other
1,00 € * 0,00 € *
Sonstiges
Böker Germany tear-proof shipping envelope

In stock

  • Other
0,01 € *
Taschenmesser, Schwarz, Nein, Backlock, 440A, G10
Magnum Most Wanted

In stock

  • Pocket Knife
  • 440A
  • G10
  • Backlock
  • No
29,95 € *
Taschenmesser, Braun, Nagelhau, Slipjoint, Damast, Ebenholz
Magnum Ebony Rangebuster Damascus

In stock

  • Pocket Knife
  • Damascus
  • Ebony
  • Slipjoint
  • Nail Nick
49,95 € *
Taschenmesser, Silber, Nagelhau, Slipjoint, 12C27, Edelstahl
Böker Plus Atlas Mini

In stock

  • Pocket Knife
  • 12C27
  • Stainless Steel
  • Slipjoint
  • Nail Nick
19,95 € *
Taschenmesser, Schwarz, Nagelhau, Linerlock, D2, G10
BlackFox Teeny D2 Black G10

In stock

  • Pocket Knife
  • D2
  • G10
  • Linerlock
  • Nail Nick
33,95 € *
Taschenmesser, Silber, Nagelhau, Backlock, Nitro-V, 2Cr13
Böker Plus MEK

In stock

  • Pocket Knife
  • Nitro-V
  • 2Cr13
  • Backlock
  • Nail Nick
49,95 € *
Taschenmesser, Rot, Flipper, Double Detent Ball, 14116, Polypropylen
Böker Plus Fire Ant Red

In stock

  • Pocket Knife
  • 14116
  • Polypropylene
  • Double Detent Ball
  • Flipper
34,95 € *
Taschenmesser, Schwarz, Flipper, Linerlock, 12C27, G10
Real Steel Iris Front Flipper G10 Black

In stock

  • Pocket Knife
  • 12C27
  • G10
  • Linerlock
  • Flipper
39,95 € *
Taschenmesser, Schwarz, Nein, Backlock, 440B, TPE
Magnum Echidna

In stock

  • Pocket Knife
  • 440B
  • Nylon, TPE
  • Raphael Durand
  • Backlock
  • No
36,95 € *
Zubehör, Schwarz
Böker Germany Thermos Flask

In stock

  • Accessory
18,95 € *
Feststehendes Messer, Schwarz, Feststehend, Damast, Ebenholz
Magnum Vernery Damast Knife

In stock

  • Fixed Blade
  • Damascus
  • Ebony
  • Fixed
49,95 € *
Taschenmesser, Schwarz, Daumenpin, Linerlock, 440A, G10
Magnum Stereo

In stock

  • Pocket Knife
  • 440A
  • G10
  • Linerlock
  • Thumb Stud
38,95 € *
Campinglampe, Grün
Nitecore LR40 Oliv

In stock

  • Camping Lantern
  • 100 Lumen
  • Integrated Battery
34,95 € *
Taschenmesser, Silber, Nagelhau, Backlock, D2, Stahl
Böker Plus Atlas Backlock Droppoint

In stock

  • Pocket Knife
  • D2
  • Steel
  • Backlock
  • Nail Nick
34,95 € *
Multitool, Grau, 3Cr13, Edelstahl
Kershaw Recab

In stock

  • Multitool
  • 3Cr13
  • Stainless Steel
8,95 € *
Feststehendes Messer, Schwarz, Feststehend, D2, G10
Sale
Böker Plus Epic

In stock

  • Fixed Blade
  • D2
  • G10
  • Mickey Yurco
  • Fixed
68,95 € * 47,95 € *
Schärfgerät, Schwarz
Work Sharp Ceramic Kitchen Knife Hone

In stock

  • Sharpener
29,95 € *
Taschenmesser, Grau, Flipper, Flipjoint, 440C, Edelstahl
Sale
Böker Plus Urban Spillo Flipjoint

In stock

  • Pocket Knife
  • 440C
  • Stainless Steel
  • Flipjoint
  • Flipper
77,95 € * 54,95 € *
Taschenmesser, Gold, Nein, Slipjoint, 440C, Messing
Böker Plus Zenshin 42 Brass

In stock

  • Pocket Knife
  • 440C
  • Brass
  • Slipjoint
  • No
49,95 € *
Taschenmesser, Schwarz, Flipper, Double Detent Ball, 14116, Polypropylen
Böker Plus Fire Ant Black

In stock

  • Pocket Knife
  • 14116
  • Polypropylene
  • Double Detent Ball
  • Flipper
34,95 € *
Taschenmesser, Schwarz, Backlock, 12C27, Edelstahl
New
Böker Plus Atlas Backlock Big

In stock

  • Pocket Knife
  • 12C27
  • Stainless Steel
  • Backlock
39,95 € *
Taschenmesser, Schwarz, Nein, Backlock, 440A, G10
Magnum Most Wanted

In stock

  • Pocket Knife
  • 440A
  • G10
  • Backlock
  • No
29,95 € *
Taschenmesser, Schwarz, Nagelhau, Slipjoint, 12C27, Edelstahl
Böker Plus Atlas Black

In stock

  • Pocket Knife
  • 12C27
  • Stainless Steel
  • Slipjoint
  • Nail Nick
25,95 € *
Taschenmesser, Silber, Nagelhau, Slipjoint, 8Cr13MoV, Edelstahl
Magnum Shiny EDC

In stock

  • Pocket Knife
  • 8Cr13MoV
  • Stainless Steel
  • Slipjoint
  • Nail Nick
29,95 € *
Taschenmesser, Braun, Nagelhau, Linerlock, 420, Holz
Böker Plus Rusticus

In stock

  • Pocket Knife
  • 420
  • Wood
  • Linerlock
  • Nail Nick
19,95 € *
Taschenmesser, Silber, Nagelhau, Backlock, Nitro-V, 2Cr13
Böker Plus MEK

In stock

  • Pocket Knife
  • Nitro-V
  • 2Cr13
  • Backlock
  • Nail Nick
49,95 € *
Taschenmesser, Schwarz, Flipper, Slipjoint, Nitro-V, G10
CIVIVI Foldis G10 Black

In stock

  • Pocket Knife
  • Nitro-V
  • G10
  • Slipjoint
  • Flipper
71,95 € *
Taschenmesser, Schwarz, Klingensporn, Friction Folder, 7Cr17, Edelstahl
Higo Kyoso

In stock

  • Pocket Knife
  • 7Cr17
  • Stainless Steel
  • Friction Folder
  • Friction
36,95 € *
Taschenmesser, Rot, Flipper, Double Detent Ball, 14116, Polypropylen
Böker Plus Fire Ant Red

In stock

  • Pocket Knife
  • 14116
  • Polypropylene
  • Double Detent Ball
  • Flipper
34,95 € *
Taschenmesser, Schwarz, Nein, Backlock, 440B, TPE
Magnum Echidna

In stock

  • Pocket Knife
  • 440B
  • Nylon, TPE
  • Raphael Durand
  • Backlock
  • No
36,95 € *
Taschenmesser, Orange, Nagelhau, Backlock, 440C, TPR
Magnum HL Single Pocket Knife Orange

In stock

  • Pocket Knife
  • 440C
  • TPR
  • Backlock
  • Nail Nick
34,95 € *
Taschenmesser, Silber, Nagelhau, Backlock, D2, Stahl
Böker Plus Atlas Backlock Clippoint

In stock

  • Pocket Knife
  • D2
  • Steel
  • Backlock
  • Nail Nick
34,95 € *
Taschenmesser, Gold, Nein, Slipjoint, 440C, Messing
Böker Plus Zenshin 42 Brass

In stock

  • Pocket Knife
  • 440C
  • Brass
  • Slipjoint
  • No
49,95 € *
Taschenmesser, Schwarz, Nagelhau, Slipjoint, 440C, G10
Böker Plus Celos G10 Black

In stock

  • Pocket Knife
  • 440C
  • G10
  • Slipjoint
  • Nail Nick
55,95 € *
Taschenmesser, Grau, Nagelhau, Slipjoint, 12C27, Edelstahl
Böker Plus Atlas SW

In stock

  • Pocket Knife
  • 12C27
  • Stainless Steel
  • Slipjoint
  • Nail Nick
25,95 € *
Taschenmesser, Braun, Nagelhau, Slipjoint, MagnaCut, Micarta
Böker Germany Coffin Burlap Micarta

In stock

  • Pocket Knife
  • MagnaCut
  • Micarta
  • Chuck Gedraitis
  • Slipjoint
  • Nail Nick
174,95 € *
Taschenmesser, Schwarz, Nagelhau, Slipjoint, 12C27, Stahl
Böker Plus Atlas Black Stonewash Brass

In stock

  • Pocket Knife
  • 12C27
  • Steel
  • Slipjoint
  • Nail Nick
29,95 € *
Taschenmesser, Braun, Nein, Slipjoint, Damast, Cocoboloholz
Böker Plus Slack Damascus

In stock

  • Pocket Knife
  • Damascus
  • Cocobolo Wood
  • Raphael Durand
  • Slipjoint
  • No
165,95 € *
Taschenmesser, Braun, Nagelhau, Backlock, 440C, Bubingaholz
Böker Plus Lockback Bubinga

In stock

  • Pocket Knife
  • 440C
  • Bubinga Wood
  • Backlock
  • Nail Nick
79,95 € *
Taschenmesser, Braun, Nagelhau, Backlock, 440A, Pakkaholz
Magnum Master Craftsman 2

In stock

  • Pocket Knife
  • 440A
  • Pakka Wood
  • Backlock
  • Nail Nick
24,95 € *
Taschenmesser, Braun, Nagelhau, Slipjoint, 14116, Ebenholz
New
History Knife & Tool Anchor Knife

In stock

  • Pocket Knife
  • 14116
  • Ebony
  • Slipjoint
  • Nail Nick
39,95 € *
Taschenmesser, Silber, Nagelhau, Slipjoint, 12C27, Edelstahl
Böker Plus Atlas Mini

In stock

  • Pocket Knife
  • 12C27
  • Stainless Steel
  • Slipjoint
  • Nail Nick
19,95 € *
Taschenmesser, Rot, Daumenöffnung, Slipjoint, 12C27, G10
Spyderco Bug G10 Red PlainEdge

In stock

  • Pocket Knife
  • 12C27
  • G10
  • Slipjoint
  • Thumb Hole
37,95 € *
Taschenmesser, Grün, Nagelhau, Slipjoint, 440C, G10
Böker Plus Worldwide 2.0

In stock

  • Pocket Knife
  • 440C
  • G10
  • Slipjoint
  • Nail Nick
44,95 € *
Taschenmesser, Blau, Daumenpin, Linerlock, 440A, Micarta
Magnum Deep Blue Canvas

In stock

  • Pocket Knife
  • 440A
  • Micarta
  • Linerlock
  • Thumb Stud
34,95 € *
Taschenmesser, Blau, Nagelhau, Slipjoint, MagnaCut, Micarta
Böker Germany Coffin Denim Micarta

In stock

  • Pocket Knife
  • MagnaCut
  • Micarta
  • Chuck Gedraitis
  • Slipjoint
  • Nail Nick
159,95 € *
Taschenmesser, Grün, Nagelhau, 440, Edelstahl
Sale
History Knife & Tool Japanese Army Pen Knife Can Opener

In stock

  • Pocket Knife
  • 440
  • Stainless Steel
  • Nail Nick
21,95 € * 13,95 € *
Taschenmesser, Grau, Flipper, Flipjoint, 440C, Edelstahl
Sale
Böker Plus Urban Spillo Flipjoint

In stock

  • Pocket Knife
  • 440C
  • Stainless Steel
  • Flipjoint
  • Flipper
77,95 € * 54,95 € *
Taschenmesser, Schwarz, Flipper, Linerlock, 440C, Aluminium
Magnum Japanese Iris

In stock

  • Pocket Knife
  • 440C
  • Aluminum
  • Linerlock
  • Flipper
29,95 € *
Taschenmesser, Braun, Nagelhau, Slipjoint, Damast, Ebenholz
Magnum Ebony Rangebuster Damascus

In stock

  • Pocket Knife
  • Damascus
  • Ebony
  • Slipjoint
  • Nail Nick
49,95 € *
Taschenmesser, Braun, Nagelhau, Palisanderholz
Magnum Classic Pocket Steel

In stock

  • Pocket Knife
  • Rosewood
  • Nail Nick
24,95 € *
Taschenmesser, Schwarz, Nagelhau, Linerlock, 440A, Aluminium
Magnum Black Spear II

In stock

  • Pocket Knife
  • 440A
  • Aluminum
  • Linerlock
  • Nail Nick
34,95 € *

Magnum

Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable price-performance ratio. However, it is not only the price-sensitive knife enthusiast who is fascinated by the wide range of handle materials and practical blade steels. The concept takes place in Solingen, design, construction and finishing in Asia.

Manufacturer information:
Heinr. Böker Baumwerk GmbH
Schützenstr. 30, 42659 Solingen, Germany
Web: www.boker.de/
E-Mail: info@boker.de
Phone: +49 212 40120

Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable... more

Show products